Fabrication shops

Automotive fabrication shop software for work nobody has written book time for.

Nobody publishes labor times for hand-forming a rocker panel, building a four-link or tubbing a car. In a fabrication shop the only honest number is the one on your own clock — so the clock has to be accurate, and the job costing has to be honest.

14 days free · No credit card · Works with your Shop Toolbox account

Why fabrication shops need their own numbers.

Shop software built on labor guides has nothing to offer when the work is one-off.

  • One-off work has no guide

    Every quote is an estimate from experience. If the hours you actually spent on the last four-link were never recorded properly, the next quote is a guess.

  • A timecard number is not a record

    “Eight hours on the Nova” tells you nothing. Which part of the job, by whom, and what went wrong is what lets you price the next one and explain this one.

  • Fabrication hours are where margin disappears

    Parts are easy to mark up. Labor that runs 30% over the quote, on a job you priced from memory, is the most common way a fab job loses money — and the hardest to see until it is over.

Real hours, honest numbers.

The timeclock, the board and the job-costing view, working together.

Timeclocks

Hours to the second, with a note on every session.

The fabricator clocks in on the task from their phone and clocks out with a note — the note is required. What you get back is a record of what was done, by whom and for how long, on which job, rather than a number on a card.

  • Per-person totals for any date range
  • Billed against unbilled, so nothing walks out the door unpaid
  • Every session says which build and which task
The timeclock report for a week: 100 hours clocked across 30 sessions, 100 hours unbilled, three technicians with per-person bars, and a session list showing the build, the task, the times and whether each is billed.
Build board

Estimated against actual on every task.

Each task carries the hours you quoted and the hours actually spent. Break a fabrication job into the pieces you would quote — mock-up, brackets, welding, finish — and the board shows which piece ran over, while there is still time to do something about it.

  • Tasks nested up to four levels deep
  • Parents roll up their children’s hours
  • Assign to a person or to Fabrication as a whole
The build board for a 1967 Mustang Fastback: two packages, Media blast & bodywork at 55% and LS swap & driveline at 43%, with nested sub-tasks showing owners, statuses, due dates and target against tracked hours.
Clock-in

Clocking in takes one tap, so it actually happens.

The crew taps the car in front of them and picks how deep — the whole vehicle or one package. There is a separate tile for shop time that belongs to no car, so cleanup and jig-building stop landing on whichever job was closest.

  • Built for the phone in someone’s back pocket
  • Open-work count shown on each car
  • Non-job time kept out of job costs
The clock-in overlay titled “Pick what you’re working on”: a photo card per build — Ellis Fastback with 10 open, Vaughn Bronco with 2, Okafor C10 with 2 — above a separate “Not on a vehicle” tile for cleanup, training and meetings.

One fabrication job, priced from your own history.

A customer wants a four-link and tubs on a ’66 Nova. You quote it as packages — mock-up, brackets and bars, tubs, finish welding — using the tracked hours from the last two you built rather than a guess. They approve on their phone. Each package becomes tasks assigned to Fabrication, and whoever clocks in claims the work and clocks out with a note. Halfway through, the board shows the brackets running eight hours over the estimate, so you call the customer about the extra work now, not at the final invoice. When the job is done, the build’s budget-against-actual tells you what it really made, and those hours become the starting point for the next four-link quote.

Questions fabrication shops ask.

How do I quote fabrication work with no book time?

Price it in packages at hours times your labor rate, using the tracked hours from similar jobs you have already done. Save the jobs you build often as package templates with the hours inside.

How precise is the time tracking?

Hours are tracked to the second. Technicians clock in on a specific task from their phone and must leave a note when they clock out.

Can I see if a fabrication job made money?

Yes. Every build shows budget against actual — approved quotes against tracked hours at your rate plus parts — live as the work happens, and the reports show parts margin line by line.

Put a real build in it.

Start your free trial

14 days free · No credit card · Already have a Shop Toolbox account? Sign in.